Loading shipping day

2025-02-25

Today is another day of plate loaded machines shipment . Today's shipment including plate loaded machines shipment .Our workers have packed the goods and concentrated them in the loading area. Today's goods are mainly Pa and life products. In order to ensure that the products are not worn, we wrap the machine with pearl cotton and use three layers of blankets to surround the machine. Because our machines are commercial fitness .

There are two main ways of loading:

The first is mechanical loading: suitable for large quantities or heavy goods, such as dumbbells, wooden boxes, iron racks, etc., using forklifts, cranes and other equipment.

The second is a combination of manual and forklift loading: suitable for bulk machines, which can save space to a greater extent.

 In order to ensure that customers receive all the Commercial fitness ordered products, we will record the number of packages of each product according to the production order, and finally check the quantity of goods shipped with sales and production before sealing the box. 

 Our loading workers formulate loading plans to optimize space utilization, ensure the stability of goods, and effectively protect the machine from damage. At the same time, we will avoid parts of the machine that are easily damaged, such as cushions, and parts that use non-main materials. 

During the loading process, we will use straps, airbags, etc. to prevent the movement of goods. After the loading is completed, the Commercial fitness and documents are ensured to be correct, and finally the container is sealed with seals, and photos and videos are taken and sent to customers. 

After loading is completed, we will send customers commercial invoices, packing lists, bills of lading, certificates of origin (optional), etc. in a timely manner. At the same time, customs declaration is made before customs cut-off to ensure that the goods are shipped out in time.

Get the latest price? We will reply as soon as possible (within 12 hours)